Major defence contractor selects Riley Surface World for de-commissioning project

Riley is principal contractor at Cobham site closure

Riley is chosen to de-commission a large metal finishing facility at Flight Refuelling Systems, part of the Cobham Group. Includes disposal of process treatment lines and all ancillary equipment. For examples of plant available see items below or go straight to SPECIAL OFFERS

More information...

Plasticraft Sulphuric Anodising Line + 2 rinse tanks

Sulphuric anodise tank and two clean water rinse tanks. Single tank of 2196 ltr capacity and working dimensions of 3000 x 1200 x 760mm deep. Lined with 2.4mm thick plasticised PVC. Includes immersion heater, cooling coil, air agitation coil, rods, connections and meter panel. Two rinse tanks internal dimensions: 500 x 1200 x 760mm deep. Rectifier available if required.

More information...

Ex Aerospace Effluent Treatment plant

Fully automatic 16,000 ltrs capacity Effluent Treatment Plant for metal finishing process waste to allow discharge within tight consent discharge limits. Has recently undergone a refurbishment programme and all control systems have been renewed with a state of art system. Designed to treat the waste from chromic anodising, sulphuric anodising, electroless nickel and hard chrome plants, plus ancillary processes.

More information...

DeVebliss Spray room with large wet back spray booth

Ex Aerospace Devilbiss Dynaclean Spray room 5m wide x 6m long x 3m high with a Hepafilter heated make up. Incorporating a Devilbiss wet back spray booth and flameproof lighting. Includes Contherm air make up and heating unit

More information...
For further information please call Helen on +44 (0) 1922 458000 or email [email protected]
Riley Surface World, a trading name of Riley Industries Ltd., Redhouse Industrial Estate, Middlemore Lane West, Aldridge, West Midlands, WS9 8BG, UK.
Tel: +44 (0) 1922 45 8000, Fax: +44 (0) 1922 45 8001
Email: [email protected], www.rileysurfaceworld.co.uk
Registered in England no. 1965748